🚚 Free Worldwide Shipping on All Orders!Shop Now

Coldwater Strong Long Leader Float Triple Rig 5/0 Shrimp Fly Kit
Coldwater Strong – Long Leader Float Triple Rig 5/0 Shrimp Fly Kit
- Includes non-compressible float
- Comes with a 3 shrimp fly leader rig
- Includes 5 × 5/0 shrimp flies in multiple colors
- Features 35 ft of 120 lb mono line for lead setup
- Includes a Cuban hand reel for storing mono line
- Built with high-quality terminal tackle
- All connections are secured using pneumatic press crimps
- Designed as a tangle-free, plug-and-play system — just attach mainline, add lead, and fish
$34.99
Coldwater Strong Long Leader Float Triple Rig 5/0 Shrimp Fly Kit—
$34.99
Product Information
Product Information
Shipping & Returns
Shipping & Returns
Description
Coldwater Strong – Long Leader Float Triple Rig 5/0 Shrimp Fly Kit
- Includes non-compressible float
- Comes with a 3 shrimp fly leader rig
- Includes 5 × 5/0 shrimp flies in multiple colors
- Features 35 ft of 120 lb mono line for lead setup
- Includes a Cuban hand reel for storing mono line
- Built with high-quality terminal tackle
- All connections are secured using pneumatic press crimps
- Designed as a tangle-free, plug-and-play system — just attach mainline, add lead, and fish




















